Buyer guide · Order planning

Fabric Printing MOQ, Sampling & Lead Times — How an Order Runs

A clear handoff makes sampling more useful and helps the production team assess the right print route. Use this guide to prepare artwork and fabric details, plan colour approval and understand when the stated lead-time windows begin.

Buyer guide · Order planning

Start with a technical check

Send the artwork together with the fabric specification: fibre content, construction, open width, weight, finish and intended end use. The team checks that the artwork and fabric fit the proposed route before a strike-off is arranged.

For roll printing, send open-width fabric that is white or bleached, bio-washed and shrinkage-controlled. Use a hydrophilic softener only; silicone softener is not suitable for this preparation.

Buyer guide · Order planning

Approve a physical sample before bulk

The strike-off takes 3–5 working days once both the artwork and fabric are received. The clock does not start when only one of those items is available.

Pantone matching is approximate. Physical swatches can be accepted as references; review the strike-off under D65 lighting. Up to three correction rounds are included without charge before sample approval.

Buyer guide · Order planning

Confirm bulk timing and dispatch

Bulk production is about 5–7 working days after the sample is approved and the bulk fabric has arrived. Dispatch is available pan-India.

Sampling is charged and paid in advance. Rush jobs are sometimes possible, subject to the artwork, fabric and production schedule; ask for confirmation before planning around an expedited date.

Minimums by print route

Choose a starting quantity for your process.

Print routeMinimumOrder type
Digital pigment AOP5 metresFabric rolls
Digital reactive AOP10 metres wovenCellulosic fabric rolls
Hybrid placement100 pieces per designCut panels and garments

Sampling is charged and paid in advance. Confirm the applicable route and sample plan before sending production fabric.

Buyer guide · Order planning

Frequently asked questions

What are the current minimum order quantities?

Pigment AOP starts at 5 metres, reactive AOP at 10 metres woven, and hybrid placement printing at 100 pieces per design.

When does the strike-off lead time begin?

The 3–5 working day strike-off period begins only after both the artwork and the fabric have been received.

How are colour approvals handled?

Pantone matching is approximate. Physical swatches can be supplied for reference, and colour should be viewed under D65 lighting before approval.

Is sampling free, and can urgent work be arranged?

Sampling is charged and paid in advance. Rush jobs are sometimes possible; ask the team to confirm timing for the specific artwork and fabric.